Quick Links

Skip to main content Skip to navigation

Main Navigation

Top

Home Page > breadcrumbs: District > breadcrumbs: Board of Education >

Working...

Ajax Loading Image

 

Renovations at Triopia

The Triopia Board of Education approved the following Health/Life Safety projects for the Summer of 2015:

  • Overlay of existing EPDM flat roofs
  • Overlay of existing gym metal roof with EPDM/TPO membrane
  • Asbestos abatement of ceiling tiles, floor tiles, plaster ceilings, piping elbow insulation
  • Installation of new suspended ceilings, lighting, floor tiles, and plaster ceilings
  • Upgrade of current HVAC system
  • Replace exterior windows
  • Replace interior wood doors and locking mechanisms
  • Renovate restrooms
  • Upgrade electric capacity

Click the image to see some of the work in progress! 

  • RSS Icon
  • Vimeo Icon
  • SchoolTube Icon
  • Flickr Icon

Triopia CUSD 27 2204 Concord-Arenzville Road Concord, IL  62631

217-457-2283 Fax: 217-457-2297

Sign up for the News Update.

Back To Top